Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PFM00530
JEFFREY AND CERRO ROMAULDO STORM DRAIN REPAIRS ATCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:JEFFREY AND CERRO ROMAULDO (SHEET 1 OF 2)1" = 10'6291181AUGUST 2013BLMG, WH, MH, BLCEPCEPDATE:BY:6/2014SR BOX CULVERTACONCRETE CRADLECJEFFREY AND CERRO ROMAULDO STORM DRAIN REPAIRS ATCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:DETAILS (1 OF 3)AS NOTED6491181AUGUST 2013BLMG, WH, MH, BLCEPCEPCONNECTION TO CATCH BASINDDATE:BY:6/2014SR NNORTHWEST CORNER OF JEFFREY AND CERRO ROMAULDOEJEFFREY AND CERRO ROMAULDO STORM DRAIN REPAIRS ATCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:DETAILS (2 OF 3)AS NOTED6591181AUGUST 2013BLMG, WH, MH, BLCEPCEPDATE:BY:6/2014SR