Loading...
HomeMy WebLinkAboutPFM00234WRF BELT FILTER PRESS PHOTO LEGEND NOTE: For the purpose of clarity, not all surfaces and components to be cleaned and painted are identified in the following photographs. The Contractor shall be responsible for cleaning and painting all surfaces and components similar to those indicated unless otherwise noted. A. Clean and paint main steel frames, columns, purlins, girts, stiffener plates, bracing angles, base plates, nuts, bolts, washers and all ferrous metal components of the building structural frame. B. Clean and paint roof metal flashing, gutter and fascia. C. Clean and paint PVC downspouts. D. Replace existing pipe hangers and rods supporting downspout with new identical stainless steel pipe hangers and support rods. E. Clean and paint mounted light fixtures. Cover and protect clear plastic lenses from paint. F. Clean unistrut and replace existing downspout pipe clamps, nuts and bolts with new stainless steel pipe clamps and hardware. G. Clean and paint pedestrian doors and door framing on both sides. H. Pressure wash interior of belt filter press building. I. Cover and protect from moisture and damage Control Room roof during project work. J. Pressure wash vertical and horizontal unistrut members supporting overhead pipes and equipment. K. Clean and paint platform tube column, base plate and all hardware. L. Clean and paint interior metal pipe components. Extent of coating is from below the PVC pipe transition to concrete floor penetration. M. Clean and paint light fixture, light pole, base plate and all hardware. N. Clean and paint existing fire hydrant. Existing coating is lead-based paint and shall be completely removed and properly disposed of prior to painting. Note: Arrow Symbol Indicates Page Number Of Photo 1 BELT FILTER PRESS BUILDING LOOKING NORTHEAST BELT FILTER PRESS BUILDING LOOKING SOUTHEAST A B A 2 B AA CB3 DD EAC DEDE 4 C DC E F A C F 5 CF F6 A B C F F C Clamp Missing Replace As Per Note F 7 FC8 E G 9 BEG A A 10 AEC D D D11 DCBAD12 AHA IJHJ 13 H A A JHA14 AGJJH15 K 16 G A L L L L L Extent Of Pipe Coating 17 M B A E C A D MN A B 18 N 19