CITY OF SAN LUIS OBISPO
STATE OF CALIFORNIA
NOTICE TO BIDDERS
1. Receipt and Opening of Bids
A) Notice is hereby given that sealed proposals will be received by the City of
San Luis Obispo, in the Public Works Administration Office, 955 Morro
Street, 93401, until 3:00pm on Thursday, November 14, 2002, at which time
they will be publicly opened and read aloud, for construction of the work
entitled:
Whale Rock Intake Valve Replacement, Specification No. 90252a
B) Any bid received at the Public Works Administration Office after the time and
date specified above shall not be considered, and shall be returned to the
bidder unopened.
C) Bids received via FAX machine shall not be considered.
D) Each bid shall be submitted in a sealed envelope plainly marked:
Whale Rock Intake Valve Replacement, Specification No. 90252a
2. General Work Description. Remove and replace five (5) 24” butterfly valves and
actuators at various depths in the intake tower structure at Whale Rock Reservoir.
3. Estimate of Total Construction Cost. $90,000
4. Contract Time. The contract time is hereby established as thirty (30) working
days.
5. Pre-Bid Conference. A pre-bid conference will be held at the Whale Rock
Project office, at 108 East 13th Street, Cayucos, 93430. The meeting will be held
at 2:00pm on Wednesday, October 23, 2002.
6. Liquidated Damages. The fixed liquidated damages amount is hereby established
as $1,000 per day for failure to complete the required work within the contract time
allowed.
7. Contractor License Requirement. The Contractor must possess a valid Class A
Contractor's License at the time of the bid opening. In addition, the Contractor shall
possess additional licenses and qualifications appropriate for confined space entry
and underwater construction in drinking water supply reservoirs.
8. Minimum Wage Requirements. Bidders are hereby notified that pursuant to
Section 1773 of the Labor Code of the State of California, the City Council of the
City of San Luis Obispo, California, has ascertained the general prevailing hourly
wage rates in the locality where this work is to be performed for each craft or type of
workman or mechanic needed to execute the Contract which will be awarded to the
successful bidder, and copies of the rates so determined are on file in the Office of
the City Engineer, 955 Morro Street, San Luis Obispo, CA 93401.
- B -
9. Securing Bid Documents. The work embraced herein shall be done in
accordance with the City Standard Specifications dated October 2000, State
Standard Specifications dated July 1999, Special Provisions, City Engineering
Standards and the plans.
A copy of the Plans and Special Provisions may be obtained in the office of the
City Engineer, 955 Morro Street, San Luis Obispo, CA 93401, by paying a non-
refundable fee of $5.00 if picked up in person, or by mailing a non-refundable fee
of $10.00 to: City of San Luis Obispo, Engineering Division, 955 Morro Street, San
Luis Obispo, CA 93401. Request must include the Specification Number.
Additionally, these Plans and Special Provisions may be downloaded at the
City’s Web Site www.slocity.org free of charge. A copy of the October 2000
City Standard Specifications may be obtained by paying a non-refundable $5.00
fee if picked up in person, or a non-refundable $10.00 fee if mailed to you by the
City Engineer's Office. Standard Specifications are also available on the City’s
web site www.slocity.org on the Public Works page. For information call 805/781-
7200.
10. Bids. Bidders shall comply with and agree to all instructions and requirements in
this notice and in the contract documents.
A) All bids must be submitted on the prescribed bid proposal form.
B) EACH BID SHALL BE ACCOMPANIED BY A CERTIFIED CHECK,
CASHIER'S CHECK OR BIDDER'S BOND MADE PAYABLE TO THE CITY
OF SAN LUIS OBISPO FOR AN AMOUNT EQUAL TO TEN PERCENT
(10%) OF THE AMOUNT OF THE BID, SUCH GUARANTY TO BE
FORFEITED SHOULD THE BIDDER TO WHOM THE CONTRACT IS
AWARDED FAIL TO ENTER INTO THE CONTRACT.
C) The City of San Luis Obispo, California, reserves the right to reject any or all
bids or waive any informality in a bid.
D) All bids are to be compared on the basis of the City Engineer's estimate of
the quantities of work to be done.
E) No bid will be accepted from a contractor who has not been licensed in
accordance with the provisions of Chapter 9, Division III of Business and
Professions Code.
F) The award of the contract, if awarded, will be to the lowest and best regular
responsible bidder whose proposal complies with the requirements
prescribed. Such award, if made, will be made within 60 calendar days
after the opening of the proposals.
11. The Contractor may substitute securities for moneys withheld under the contract in
accordance with the provisions of the Public Contract Code, Section 10263.
SPECIAL PROVISIONS
1. PLANS AND SPECIFICATIONS
The work embraced herein shall be done in accordance with these Special Provisions and
the City of San Luis Obispo, Department of Public Works, Standard Specifications October
2000 edition, in conjunction with the State of California, Department of Transportation
Standard Specifications dated July 1999.
In case of conflict between the Standard Specifications and these Special Provisions, the
Special Provisions shall take precedence.
2. EXECUTION OF CONTRACT, BEGINNING OF WORK, TIME OF
COMPLETION, AND LIQUIDATED DAMAGES
Contract bidding, award, execution and administration shall conform the provisions in the
Standard Specifications and these Special Provisions.
Immediately following award of the project to the Contractor, Contractor shall order the 24”
butterfly valves and actuators. A local supplier has indicated that the lead-time for the
valves is approximately 6-8 weeks. The construction period of thirty (30) working days
shall begin on the first Monday after the valves are delivered.
The Contractor shall pay to the City of San Luis Obispo Liquidated Damages in the
amount set forth in the Notice to Bidders, for each and every calendar day's delay in
finishing the work in excess of the number of Working Days identified in the Notice to
Bidders.
3. TRADE NAMES, ALTERNATIVES & SUBSTITUTIONS OF “OR EQUAL”
MATERIALS.
Substitutions for alternative or “equal” products and materials shall be as specified in
Section 6-1.05 of the Standard Specifications except as herein modified.
Substitutions requested after bid opening shall be made in ample time to permit
approval without delaying the work.
Any substitutions that may be approved shall be furnished without additional cost to the
City. If any changes are required for the proper installation and fit of alternative
materials or equipment, or because of deviations from the contract plans and
specifications, such changes shall not be made without the consent of the Engineer and
shall be made without additional cost to the City.
4. CITY FURNISHED MATERIAL.
NONE.
5. OPERATIONAL PROCEDURES.
All work shall take place under the provisions of Sections 4, 5, 6, 8, and 9, “Scope of
Work,” “Control of Work,” "Control of Materials," “Prosecution and Progress,” and
“Measurement and Payment” of the Standard Specifications and these Special Provisions.
1
SPECIAL PROVISIONS
Operational procedures shall conform to the provisions in Section 7 of the Standard
Specifications. Attention is directed to the provisions in subsections 7-1.01G "Water
Pollution," 7-1.11 "Preservation of Property,” and 7-1.12 "Responsibility for Damage” of
the Standard Specifications and these Special Provisions.
In addition to the provisions in Section 7-1.01G “Water Pollution,” the Contractor shall
submit a pollution control plan identifying how runoff from the site is to be controlled in the
event of inclement weather. Hay bales will not be allowed for filtering. Approval of the
plan by the Engineer does not release the Contractor from the responsibility of allowing
only clean rainwater to leave the site. The Contractor is responsible to make immediate
changes in the control system as needed. Any penalties levied against the Contractor
and/or the City shall be the responsibility of the Contractor. Retention for penalties will be
made in accordance with the provisions in Section 7-1.01K for permit violations.
OSHA compliance shall conform to the provisions in Section 7-1.06, "Safety and Health
Provisions," and these Special Provisions.
Restoration of benchmarks and monuments, and establishment of lines and grades shall
conform to the provisions in Section 5-1.07, "Lines and Grades" of the Standard
Specifications. In addition to the provisions of Section 5-1.07 “Lines and Grades” of the
Standard Specifications, grade control, shall be provided in Metric units of measurement
for verification by the Engineer. For projects shown on the plans to be built in English
units, grade control shall be provided in English units.
The Contractor shall complete layout for the work. The Contractor shall notify the
Engineer when layout is complete and all USA markings have been placed. The
Contractor shall bring any potential conflicts to the attention of the Engineer. No work shall
be performed until the Engineer has verified the layout.
Dust control shall conform to the provisions in Section 10, "Dust Control," of the Standard
Specifications and these Special Provisions.
Watering shall conform to the provisions in Section 17, "Watering" of the Standard
Specifications and these Special Provisions.
The Contractor shall supply and deliver notices of the work to all properties adjacent to
and within 30 meters of the work areas. The notice shall briefly describe the work,
potential impacts on the adjacent property, and shall include the Contractor’s phone
number. Notices shall be placed at least 48 hours in advance of the work and shall
state the dates work will take place adjacent to that particular property. The Engineer
prior to distribution shall approve wording for the notice. Notices shall NOT be placed
inside mailboxes. Placing notices in mailboxes is prohibited by law. Notices should be
hand delivered or made up as a door hanger.
2
SPECIAL PROVISIONS
Normal work hours are between 7 a.m. and 4 p.m. Allowable working hours are
between 7 a.m. and 7 p.m.
Failure to comply with the provisions in this section shall be considered a material breach
of contract. All work shall cease until contractor can demonstrate active compliance with
these requirements. Any delay caused by failure to comply shall be the full responsibility of
the contractor and no additional contract time or compensation will be allowed therefore.
Full compensation for conforming to the requirements of this section shall be included in
the contract prices paid for the various items of work and no additional compensation shall
be allowed therefore.
6. EXTRA WORK, FORCE ACCOUNT PAYMENT.
The Contractor shall submit a list of equipment they anticipate will be used on the
project and the associated Caltrans Equipment Rental Rate. If there is no established
rate, the Contractor should so indicate. This information shall be provided at the pre-
construction conference.
In addition to the provisions in Section 9-1.03A(1) “Labor” of the Standard
Specifications, the following provisions shall apply:
For the purposes of calculating the cost of Extra Work, Force Account Payment, owner,
superintendents or other salaried employees performing work on the project shall be
billed at the prevailing wage corresponding to the type of work performed.
7. CONSTRUCTION DETAILS.
7-1.01 REPLACEMENT OF INTAKE TOWER VALVES.
The Contractor shall remove and replace the five (5) 24” butterfly valves and actuators.
The existing valves were manufactured by Henry Pratt Company and were originally
installed around 1960. The original plan for the valves is included in this specification.
Several “as-built” drawings of the intake tower are also included. These drawings are over
40 years old, and are difficult to read. Therefore, the drawings are provided for information
and clarification of these specifications only. Some of the more important information
about the existing intake tower and valves is summarized below:
• Internal dimensions of the intake tower are approximately 5’-6” tall by 4’-0” wide.
• The intake tower is approximately 270’ long and extends down the bank into the
reservoir at an angle of approximately 38º from horizontal.
• The top of the intake tower is at elevation 232.5’, while the outlet pipe at the bottom
of the tower is at elevation 63.5’.
• The five 24” intake valves are at elevation 70’, 100’, 130’, 160’, and 190’.
• Due to their depth, the actuators for valves #4 and #5 are eight inch (8”) bore, while
the actuators for valves #1, #2, and #3 are six inch (6”) bore. All five actuators shall
have a twenty-two inch (22”) stroke.
3
SPECIAL PROVISIONS
• At the end of August 2002, the water surface elevation of the reservoir was around
elevation 205’, approximately eleven feet below the spillway elevation of 216’.
• Cast iron manhole steps have been cast into the floor of the intake tower, which
may either facilitate or hinder access to the intake tower valves.
The existing intake tower valves are bolted to 24” I.D. cast iron wall thimble spools, which
are cast into the concrete ceiling of the intake tower. The wall thimbles have been drilled
and tapped as indicated on the plans. The new valves shall be furnished with the same
bolt pattern and shall be installed with new gaskets and bolts.
The valves shall be AWWA C504 Class 150 flanged cast iron body, ductile iron disc, 316
stainless steel disc edge, 304 stainless steel stem, BUNA-N seat (or equal), sized for 100
psi pressure, double acting with jack screw override, epoxy coating, fully rubber lined body
with fusion epoxy coated disc (CMB K-Flo 500 Series, or equal). Actuators shall be ductile
iron/stainless steel, quarter-turn, spring return and double acting actuators with output
torques to 115,000 lb.in. (Morin 79B Actuators, or equal). Note that the actuators for
valves #1, #2, and #3 are six-inch (6”) bore and valves #4 and #5 are eight-inch (8”) bore.
Contractor shall submit a plan for replacement of the valves to the City for approval. The
plan shall include the method for accessing and removing the old valves, the sequence of
work, work schedule, and planned procedures for re-activating the intake tower in the case
of emergency. The Contractor shall at all times be able to re-establish operation of the
intake tower within 24 hours of receiving notice by the City.
Contractor shall be responsible for all aspects of the work, including personnel safety and
the preservation of City property. If during the course of construction, the Contractor
becomes aware of material failures, substantial corrosion, and other deficiencies, they
shall be immediately brought to the attention of the engineer. To the extent possible, the
cause of the failure will be determined and appropriate course of action and/or remedy will
be discussed. Any work required to correct unforeseen deficiencies shall be ordered and
paid as extra work at force account rates.
7-1.01.01 Payment.
Replacement of the 24” butterfly valves includes all work to remove and replace the valves
and actuators to full working order, including any and all labor, tools, equipment, power,
personnel, testing, fittings, gaskets, seals, and other materials to provide a complete
project, and no additional compensation shall be allowed therefor.
7-1.02 PROVIDE TEMPORARY WATER DELIVERY FOR CAYUCOS AREA WATER
ORGANIZATIONS (CAWO).
Contractor shall provide temporary water service to the CAWO by piping water over the
spillway. The point of connection for the temporary piping shall be the 6” ductile iron
pipeline that crosses the spillway above ground along the side of the access road at the
4
SPECIAL PROVISIONS
base of the dam (see Exhibit 1). The Contractor shall submit a plan for providing this
temporary CAWO service to the City for approval. The plan shall include sufficient
safeguards against surge, water hammer, vacuum, and other potentially damaging
affects. The temporary system shall be capable of providing 600 gallons per minute
(gpm) for a ten-hour period between 8am and 8pm each day. The depth of the intake
shall be approximately twenty-five (25) feet below the lake water surface, with the ability
to change the intake depth by fifteen (15) feet both higher and lower. The temporary
water service is expected to require approximately one thousand feet (1,000‘) of 6” pipe.
7-1.02.01 Payment.
The project shall include all materials, supplies, power, equipment, and labor to provide
temporary water service to the CAWO to the City’s satisfaction, and no additional
compensation shall be allowed therefor.
7-1.03 COMPLY WITH OSHA and PROVIDE FOR INSPECTION.
Contractor shall comply with OSHA, CalOSHA, and all other federal, state, and local
regulations concerning safety. All work performed under this contract shall be
conducted with the highest regard for safety of all persons and property.
The Contractor shall provide the necessary confined space entry and emergency
retrieval equipment to allow a City inspector to access the intake tower to inspect the
finished work. Other inspections may be necessary depending on conditions found
during the valve replacement project.
7-1.03.01 Payment.
Compliance with OSHA shall include full compensation for furnishing all labor,
materials, tools, equipment, personnel, medical screening and incidentals, and for doing
all the work involved to comply with all OSHA regulations pertinent to the types of work
to be done under this contract, including preparation of worker protection plan required
by Section 6705 of the Labor Code, and no additional compensation shall be allowed
therefor.
7-2.01 Engineering Standards & State Standard Plans.
Engineering Standards & State Standard Plans have been included in these Special
Provisions as a convenience to the contractor. Any additional standards, referenced or
not, which are required for completion of the work and for which are not included in the
following list, can be found in the current edition of the City Engineering Standards and
State Standard Plans.
5
TEMPORARY WATER
SERVICE P. O. C.13th ST .WHALE ROCK
OFFICE
WHALE ROCK DAM
& FACILITIES
VALVE VAULT
O L D C R E EK
ACCESS ROAD
SPILLWAY
BOAT HOUSE INTAKE TOWER
EVAPORATION PAN DAM CREST
The City of San Luis Obispo is committed to include the disabled in all of it services, programs and activities.
Telecommunications Device for the Deaf (805) 781-7410.
955 Morro Street; San Luis Obispo, CA 93401
ADDENDUM
DATE: November 6, 2002
PROJECT: Whale Rock Intake Tower Valves Replacement Project – Spec. No. 90252a
ADDENDUM NO.: 1
BID DATE: Thursday, November 14, 2002
NOTICE TO ALL CONTRACTORS SUBMITTING BIDS AND TO ALL PLANHOLDERS:
You are hereby notified of the following changes, clarifications or modifications to the contract
documents. This addendum shall supersede the original contract documents and
subsequent addenda. Wherein this addendum contradicts the original contract documents
and previous addenda, this addendum shall take precedence. All other conditions shall
remain unchanged. The change specified below shall become a legal part of the original
contract documents.
A. CHANGES AND/OR CLARIFICATIONS TO THE SPECIFICATIONS:
Valves. The spools to which the valves attach are cast with the bottom face of the flange flush with
the ceiling of the intake tower. The flange is drilled and tapped, with studs threaded into the holes.
The valves are attached to the studs with nuts as indicated on the plans. Standard 24” AWWA C504
Butterfly Valves will not work, due to four of the holes being tapped as a result of clearance
restrictions. The valves that were originally installed are “long-body” valves, which allow sufficient
clearance for all of the holes to fit cleanly over the existing studs. A standard valve and spool piece
may work, though the City’s preference is for the long-body valves. Contractors shall submit bids for
long-body valves that will allow for “through bolting” of all 20 holes. If the cost is substantially less,
Contractors may include an alternate price for standard valves and spool pieces along with their bid for
the long-body valves. The City will decide, at its sole discretion, whether to allow standard valves and
spool pieces.
The specification is further amended to eliminate the requirement that the valves have a rubber lined
body. The valves shall have a seat that can be replaced in the field. Valves shall be AWWA Class
150B, Cast Iron body, cast or ductile iron disc, 316 stainless steel edge, 304 stainless steel shaft, Buna
N seat, epoxy coated disc, epoxy coated or rubber lined body (Henry Pratt, K-Flo, or owner approved
equal).
Actuators. The actuators specified are not recommended for continuous submergence. They are also
pneumatic, rather than the required hydraulic actuation. The specification is amended to require that
the new actuators shall be all stainless units approved for continuous submergence, with special piston
seals specifically designed for water supply actuation. In addition, all adapting hardware necessary to
mount the actuators to the valves shall be stainless steel.
The City of San Luis Obispo is committed to include the disabled in all of it services, programs and activities.
Telecommunications Device for the Deaf (805) 781-7410.
The valve actuator shall be sized for operational loads based on full differential head pressure, using a
full lake water level and dry on the back side of the valve. Flow velocities and dynamic torque shall be
calculated by the valve manufacturer and used for sizing of the actuators. A de-clutchable manual gear
override shall be included as an integral part of the valve actuator. The override shall allow for full
valve operation by one person using the same dynamic torque loads as above. The manual override
shall be such that the valve can be placed back into automatic operation without disassembly of the
actuator. The actuator shall be rated for full water submerged service to the water depths shown on the
drawings for each valve location. The actuator shall be Morin stainless steel S-Series with manual de-
clutchable override or approved equal. The actuator shall fit into the required space as shown on the
drawings and shall be rated for full submergence. Actuator sizing calculations shall be submitted for
review showing dynamic torque loads and actuator output.
B. CHANGES AND/OR CLARIFICATIONS TO THE PLANS: as described above.
C. CHANGES AND/OR CLARIFICATIONS TO THE CONTRACT PROPOSAL: none.
D. GENERAL CLARIFICATIONS: as described above.
Contractors shall note the acknowledgment of this addendum in the appropriate space
provided on the Contract Proposal sheet “f”.
If you have any questions, contact Dan Gilmore at (805) 781-7208.
Sincerely,
JAY D. WALTER
CITY ENGINEER